Replace Feeders 216 & 316
- Owner: Sewerage & Water Board of New Orleans
- Client: Sewerage & Water Board of New Orleans
- Location: New Orleans, LA
Replacement of roughly 2.5 miles of underground 15KV cables to supply redundant power for Pump Station 6, the main pump station for the 17th St Canal, from the Main Water Treatment Plant.
Recent Projects
-
Dwyer Road Pumping Station
Construction of a new pump station on Dwyer Rd Canal -
St. Charles Avenue Streetcar Line - Traction Electrification Rehabilitation
Replacement of traction power cables for St Charles Ave streetcar line -
Replace Boiler #2
Replacement of boiler at main New Orleans water treatment plant -
Replace Clarifiers at East Bank Wasterwater Treatment Plant
Replacement of eight clarifiers at main New Orleans eastbank wastewater treatment plant -
Rough in Cameras and Doors for New Security System at Louis Armstrong International Airport
Installation of electrical infrastructure for new security system at New Orleans International Airport -
Bridge Widening of the Huey P. Long Bridge
Expansion of Huey P Long Bridge over Mississippi River -
Carbon Slurry Feed Systems
Addition of new carbon slurry feed systems to several treatment plants in Jefferson Parish -
Lakeshore Drive Lighting Repairs - Reaches 1, 3, 4 & 5
Repairs to street lighting along Lakeshore Dr -
Expansion of the Cousins Pumps Station
Construction of addition to Cousins Pump Station -
Expansion of the St. Charles Surgery Center
Construction of new 3-story addition at St Charles Surgery Center -
Install Disinfection System at the Algiers Water Plant
Installation of new disinfection system -
Replace the Trash Screens at Pump Station 13
Replacement of trash screens at Pump Station 13 -
Harvey Canal Sector Gates
Installation of new sector gates at Harvey Canal -
Lawless Chapel at Dillard University
Construction of new chapel at Dillard University -
Site Electrical Distribution at Dillard University
Installation of underground electrical infrastructure at Dillard University -
Tool Fabrication & Maintenance Relocation at Michoud Assembly Center
Build out for addition of new tool fabrication area at Michoud Assembly Facility -
Building 103 Orion Assembly at Michoud Assembly Center
Renovation of various locations in existing Building 103 at Michoud Assembly Facility -
Electrical Distribution & Controls at Pontchartrain Pump Station
Repair building which includes all new electrical components, generator, lighting fixtures and instrumentaiton -
Automation & Electrical for 7 Safe Houses at Various Pump Stations
Construction of new hurricane safe houses at various pump stations in Jefferson parish -
Replace Feeders 216 & 316
Replacement of underground high voltage feeders -
New Clubhouse for Southern Yacht Club
Construction of new clubhouse for Souther Yacht Club -
Renovations to St. Charles Parish Water Treatment Plant
Addition of new clarifiers and control building for St Charles water treatment plant