Replace The Trash Screens At Pump Station 13
- Owner: Sewerage & Water Board of New Orleans
- Client: M. R. Pittman Group, LLC
- Location: New Orleans, LA
Replacement of existing catenary screen clears with modernized mechanical climber screen cleaners.
Recent Projects
-
Dwyer Road Pumping Station
Construction of a new pump station on Dwyer Rd Canal -
St. Charles Avenue Streetcar Line - Traction Electrification Rehabilitation
Replacement of traction power cables for St Charles Ave streetcar line -
Replace Boiler #2
Replacement of boiler at main New Orleans water treatment plant -
Replace Clarifiers at East Bank Wasterwater Treatment Plant
Replacement of eight clarifiers at main New Orleans eastbank wastewater treatment plant -
Rough in Cameras and Doors for New Security System at Louis Armstrong International Airport
Installation of electrical infrastructure for new security system at New Orleans International Airport -
Bridge Widening of the Huey P. Long Bridge
Expansion of Huey P Long Bridge over Mississippi River -
Carbon Slurry Feed Systems
Addition of new carbon slurry feed systems to several treatment plants in Jefferson Parish -
Lakeshore Drive Lighting Repairs - Reaches 1, 3, 4 & 5
Repairs to street lighting along Lakeshore Dr -
Expansion of the Cousins Pumps Station
Construction of addition to Cousins Pump Station -
Expansion of the St. Charles Surgery Center
Construction of new 3-story addition at St Charles Surgery Center -
Install Disinfection System at the Algiers Water Plant
Installation of new disinfection system -
Replace the Trash Screens at Pump Station 13
Replacement of trash screens at Pump Station 13 -
Harvey Canal Sector Gates
Installation of new sector gates at Harvey Canal -
Lawless Chapel at Dillard University
Construction of new chapel at Dillard University -
Site Electrical Distribution at Dillard University
Installation of underground electrical infrastructure at Dillard University -
Tool Fabrication & Maintenance Relocation at Michoud Assembly Center
Build out for addition of new tool fabrication area at Michoud Assembly Facility -
Building 103 Orion Assembly at Michoud Assembly Center
Renovation of various locations in existing Building 103 at Michoud Assembly Facility -
Electrical Distribution & Controls at Pontchartrain Pump Station
Repair building which includes all new electrical components, generator, lighting fixtures and instrumentaiton -
Automation & Electrical for 7 Safe Houses at Various Pump Stations
Construction of new hurricane safe houses at various pump stations in Jefferson parish -
Replace Feeders 216 & 316
Replacement of underground high voltage feeders -
New Clubhouse for Southern Yacht Club
Construction of new clubhouse for Souther Yacht Club -
Renovations to St. Charles Parish Water Treatment Plant
Addition of new clarifiers and control building for St Charles water treatment plant

